WiseTraceCore Request an assessment

One batch number, and the whole production chain is a few clicks away.

A traceability system for cosmetics, skincare and food supplement manufacturers. From the raw material you receive to the batch you ship, every step is on record and can be looked up at any time. When an audit comes, the documentation is already in place.

Lavender fragrance oil BEE-2026-00042 Goods receipt 28 Jan 2026 08:12 Blending 12 Feb 2026 11:05 Filling 14 Feb 2026 07:40 Packaging 14 Feb 2026 10:15 Reported finished 14 Feb 2026 14:22
Goods receipt Blending Production Finished product Fragrance oil BEE-2026-00042 Alcohol BEE-2026-00051 Fixative BEE-2026-00058 Glass bottle BEE-2026-00063 Pump + cap BEE-2026-00071 Fragrance blend INOX-2026-0003 yield 98.4% Filling GY-2026-00118 14 Feb 2026 · morning Finished product KT-2026-00204 1,240 pcs · 50 ml tracing back traced
Forward: the material's way through production. Back: from the finished product batch to every raw material in it.

It is all there on paper. You just can't find it.

The traceability lives in folders, spreadsheets and a few colleagues' heads.

The auditor asks about a batch

And the search begins:

  • Which folder it is in
  • Which spreadsheet
  • Who filled it in
  • Whether it still exists at all

One question, and half a day is gone.

Something is wrong with a raw material

Now you need to know which finished products it went into, and who those were shipped to. For as long as you are looking, the recall is waiting too.

One or two people know everything

They know how to fill in the sheet, where the old batch is, and what that mark on it means. If they resign, they take all of it with them.

batches_final_new.xlsx Production sheet not found

The system adapts to you, not you to the system

From goods receipt to shipping, it handles the steps you actually carry out. That is what sets it apart from a general warehouse program.

Batch tree

Starting from a finished product, you can walk the whole chain backwards:

  • Which semi-finished product it was made from
  • Which raw material batches
  • Which supplier they came from
  • Through which production steps
  • Who recorded it, and when

Starting from a raw material lot, you can also see forwards where it went:

  • Into which semi-finished batch
  • Into which finished product batch
  • To which customer

Lot-level stock

Every receipt gets its own batch number and a status: released, blocked or scrap. In production, stock is drawn from the lot you actually used, not from a pooled quantity.

Production and blending

  • Formulation reference with version
  • Batches used
  • Yield and loss
  • Shift and person responsible

A semi-finished product gets a batch number just like a finished product does.

Audit log

Every critical action is recorded: who changed what, when, from what to what. The log cannot be edited and cannot be deleted, so you can still rely on it later.

One lot's journey through the system

Sample Cosmetics Ltd.demo data

Pick a direction, then a lot or a batch. The chain shows what the system has recorded about it.

Direction
Starting point

Where it went: Lavender fragrance oil, BEE-2026-00042

Raw material lot
  • Raw material lotLavender fragrance oilBEE-2026-00042Sample Fragrances Ltd.Received: 28 Jan 2026, Anna Samplerecorded

First branch

Production
  • Blending (semi-finished)Lavender baseINOX-2026-000312 Feb 2026, Bence Samplerecorded
  • FillingLavender face mist 50 mlGY-2026-0011814 Feb 2026, Anna Samplerecorded
Finished product batch
  • Finished product batchLavender face mist 50 mlKT-2026-00204Packaged: 14 Feb 2026, Bence Samplerecorded
Customer
  • ShipmentSample Drugstore Ltd.20 Feb 2026, Anna Samplerecorded
  • ShipmentSample Webshop Ltd.23 Feb 2026, Anna Samplerecorded

Second branch

Production
  • Blending (semi-finished)Lavender body lotion baseINOX-2026-000424 Feb 2026, Bence Samplerecorded
  • FillingLavender body lotion 200 mlGY-2026-0013625 Feb 2026, Anna Samplerecorded
Finished product batch
  • Finished product batchLavender body lotion 200 mlKT-2026-00212Packaged: 26 Feb 2026, Bence Samplerecorded
Customer
  • ShipmentSample Salon Ltd.2 Mar 2026, Bence Samplerecorded
  • ShipmentSample Webshop Ltd.4 Mar 2026, Anna Samplerecorded

Where it went: Cosmetic alcohol 96%, BEE-2026-00051

Raw material lot
  • Raw material lotCosmetic alcohol 96%BEE-2026-00051Sample Chemicals Ltd.Received: 2 Feb 2026, Anna Samplerecorded

First branch

Production
  • FillingLavender face mist 50 mlGY-2026-0011814 Feb 2026, Anna Samplerecorded
Finished product batch
  • Finished product batchLavender face mist 50 mlKT-2026-00204Packaged: 14 Feb 2026, Bence Samplerecorded
Customer
  • ShipmentSample Drugstore Ltd.20 Feb 2026, Anna Samplerecorded
  • ShipmentSample Webshop Ltd.23 Feb 2026, Anna Samplerecorded

Second branch

Production
  • FillingRosemary hair tonic 100 mlGY-2026-00127Started: 19 Feb 2026, Anna SampleUnder QC testingin progress
Finished product batch

No finished product batch yet

Customer

No shipment yet

Where it went: Shea butter, BEE-2026-00083

Raw material lot
  • Raw material lotShea butterBEE-2026-00083Sample Ingredients Ltd.Received: 17 Feb 2026, Bence Samplerecorded
Production
  • Blending (semi-finished)Lavender body lotion baseINOX-2026-000424 Feb 2026, Bence Samplerecorded
  • FillingLavender body lotion 200 mlGY-2026-0013625 Feb 2026, Anna Samplerecorded
Finished product batch
  • Finished product batchLavender body lotion 200 mlKT-2026-00212Packaged: 26 Feb 2026, Bence Samplerecorded
Customer
  • ShipmentSample Salon Ltd.2 Mar 2026, Bence Samplerecorded
  • ShipmentSample Webshop Ltd.4 Mar 2026, Anna Samplerecorded

What it was made from: Lavender face mist 50 ml, KT-2026-00204

Finished product batch
  • Finished product batchLavender face mist 50 mlKT-2026-00204Packaged: 14 Feb 2026, Bence Samplerecorded
Production
  • FillingLavender face mist 50 mlGY-2026-0011814 Feb 2026, Anna Samplerecorded
  • Blending (semi-finished)Lavender baseINOX-2026-000312 Feb 2026, Bence Samplerecorded
Raw material lot
  • Into blendingLavender fragrance oilBEE-2026-00042Sample Fragrances Ltd.Received: 28 Jan 2026, Anna Samplerecorded
  • Into fillingCosmetic alcohol 96%BEE-2026-00051Sample Chemicals Ltd.Received: 2 Feb 2026, Anna Samplerecorded
  • Into fillingPlant-based fixativeBEE-2026-00058Sample Fragrances Ltd.Received: 5 Feb 2026, Bence Samplerecorded
  • Into packagingGlass bottle 50 mlBEE-2026-00063Sample Packaging Ltd.Received: 9 Feb 2026, Anna Samplerecorded
  • Into packagingPump and capBEE-2026-00071Sample Packaging Ltd.Received: 9 Feb 2026, Anna Samplerecorded
Supplier
  • SupplierSample Fragrances Ltd.BEE-2026-00042, BEE-2026-00058
  • SupplierSample Chemicals Ltd.BEE-2026-00051
  • SupplierSample Packaging Ltd.BEE-2026-00063, BEE-2026-00071

What it was made from: Lavender body lotion 200 ml, KT-2026-00212

Finished product batch
  • Finished product batchLavender body lotion 200 mlKT-2026-00212Packaged: 26 Feb 2026, Bence Samplerecorded
Production
  • FillingLavender body lotion 200 mlGY-2026-0013625 Feb 2026, Anna Samplerecorded
  • Blending (semi-finished)Lavender body lotion baseINOX-2026-000424 Feb 2026, Bence Samplerecorded
Raw material lot
  • Into blendingLavender fragrance oilBEE-2026-00042Sample Fragrances Ltd.Received: 28 Jan 2026, Anna Samplerecorded
  • Into blendingShea butterBEE-2026-00083Sample Ingredients Ltd.Received: 17 Feb 2026, Bence Samplerecorded
  • Into packagingBottle 200 mlBEE-2026-00087Sample Packaging Ltd.Received: 18 Feb 2026, Anna Samplerecorded
Supplier
  • SupplierSample Fragrances Ltd.BEE-2026-00042
  • SupplierSample Ingredients Ltd.BEE-2026-00083
  • SupplierSample Packaging Ltd.BEE-2026-00087

On paper and in the system

On paper and in the system
On paper and in Excel In the system
A batch's history Searching folders and spreadsheets; one question takes half a day From a finished product, the whole chain can be walked backwards
Who recorded it, and when No guarantee you find out who filled it in, or whether it still exists Every critical action records who changed what, and when
Keeping the knowledge One or two people know where the old batch is and what the mark means; if they resign, it goes with them The log only grows; an existing entry cannot be rewritten and cannot be deleted
A problem raw material You have to search for which finished products it went into, and who those were shipped to The raw material lot shows which finished product batch it went into, and who it was shipped to
Stock at the point of use A pooled quantity goes down Every receipt gets its own batch number and status; the lot actually used goes down

What your team will see every day

Five of the screens you will use day to day: traceability, production orders, goods receipt, lot-level stock and product formulations. The layout, the menu and the colours are the same as in the application.

Sample Cosmetics Ltd. demo data
WiseTraceCore
Master data
Production
Warehouse
Traceability
demo.user@samplecosmetics.example

Traceability

The full production chain of one order, from raw materials to packaging

Order statisticsGY-2026-00118
Chain depth
4 levels
Source materials
5 items
Used in
1 order
QC status
Released
Production chain: Raw materials Blending Filling Packaging
Raw materials5
BEE-2026-00042

Lavender fragrance oil

12.00 kgReleased

Sample Fragrances Ltd.

Received: 28 Jan 2026

Anna Sample

BEE-2026-00051

Cosmetic alcohol 96%

48.00 lReleased

Sample Chemicals Ltd.

Received: 2 Feb 2026

Anna Sample

BEE-2026-00058

Plant-based fixative

2.40 kgReleased

Sample Fragrances Ltd.

Received: 5 Feb 2026

Bence Sample

BEE-2026-00063

Glass bottle 50 ml

1,300.00 pcsReleased

Sample Packaging Ltd.

Received: 9 Feb 2026

Anna Sample

BEE-2026-00071

Pump and cap

1,300.00 pcsReleased

Sample Packaging Ltd.

Received: 9 Feb 2026

Anna Sample

Blending (semi-finished)1
INOX-2026-0003

Lavender base (semi-finished)

62.4 kgReleased

Production order: GY-2026-00121

Blended: 12 Feb 2026

Bence Sample

Filling1
GY-2026-00118Current

Lavender face mist 50 ml

1,240 pcsReleased

Semi-finished: INOX-2026-0003

Filled: 14 Feb 2026

Anna Sample

Packaging1
KT-2026-00204

Lavender face mist 50 ml

1,240 pcsReleased

Production order: GY-2026-00118

Packaged: 14 Feb 2026

Bence Sample

The screens above show the system's interface with the invented data of an invented demo company. It is not a live application, and it is not a real manufacturer's data.

Every industry gets the same question: where from, where to

A perfume maker is held to different requirements than a food supplement manufacturer. The standards named here are the expectations that apply to you. Whether you meet them is for a qualified professional to say, not for the software.

one step back one step forward Supplier raw material lot received Your batch blending, filling, packaging Customer finished product shipped

Cosmetics and perfume

ISO 22716EU 1223/2009

Good manufacturing practice expects every batch you release to come with the list of raw materials used and their batch numbers, the production conditions, and the release document. If all of that sits in folders, a question from a customer or an authority takes days to answer.

Skincare and natural cosmetics

COSMOSNATRUE

Here the certified ingredients have to be traced as well: which delivery arrived with which certificate, and exactly which finished product batch it went into. Batch level cannot answer that. You need to know at lot level which receipt the material was drawn from.

Food supplements

HACCP(EC) No 178/2002

The regulation sets out the “one step back, one step forward” principle: you must know who an item came from, and who it went to. That works when goods receipt, production and shipping sit in one chain, not in three separate spreadsheets.

The data is yours, and we look after it

Where the data is, who can reach it, and what is kept of it.

Infrastructure within the EU
The application and the database run within the EU, in the Frankfurt region.
Role-based access
Everyone sees and can write what their job requires. You define the roles.
Audit log that cannot be modified
The log only grows. An existing entry cannot be rewritten and cannot be deleted.
Backups
A database backup every day and a full backup every week.
Data separated per company
Your data is stored separately. A user from another organisation cannot reach it.
goods receipt recorded 08:12 batch released 09:40 blending closed 11:05 shipment recorded 14:22

Three steps from paper to a live system

First we look at how you manufacture, and only then do we build. We do not sell boxed software.

  1. Assessment

    We go through the way you work today: paper templates, Excel sheets, production steps, batch coding. At the end you get it in writing, what stands where, along with a specific offer.

    Paid, and counts toward the implementation price
  2. Implementation

    We build what was set down in the assessment. At a fixed price, with no hourly billing. It comes with an interface in English or Hungarian, access management, an audit log, a user guide and training for the team.

    Fixed price, starts with a deposit
  3. Operation

    Live use runs under a separate operating agreement. It covers maintenance, backups, fault handling, and the updates that follow changes in legislation.

    Monthly fee

You know in advance what is ours to do, and what is yours

The same three steps, this time in detail: what we do, and what we ask of you. Take the second column seriously, because if it is missing, the implementation stops.

  1. Assessment

    By the end there is a written process map and a specific offer. For that we need to see how you really manufacture today, not how it is written down.

    How long it takes depends on how complex your production processes are, and on how quickly we get answers from you. Usually three weeks at most.

    What we do

    • We go through the production process step by step, from goods receipt to shipping
    • We review the paper templates and Excel sheets you use today
    • We note where data is created today, and where it gets lost
    • We put in writing what stands where, and what is worth moving into a system

    What we ask of you

    • A description of the process as it really runs in production
    • The paper templates in use: batch record, receipt sheet, production sheet
    • A few filled-in sample documents from a closed batch
    • A named internal contact who answers our questions
  2. Implementation

    We build what was set down in the assessment. This is the stage that decides whether the system follows your process, or you have to adapt to it.

    Its length also depends on complexity: it tends to be between one and four months. The test period is usually one month.

    What we do

    • We build the scope set down in the assessment
    • We load the master data: items, formulations, suppliers, warehouses
    • We set up the roles and permissions
    • Interface in English or Hungarian, user guide and training for the team

    What we ask of you

    • The master data in an approved, orderly form
    • A decision on who may see what and who may record what
    • A test period in which the team records real batches
    • Feedback on the test before we go live
  3. Operation

    Live use runs under a separate operating agreement. From here on it is ongoing work, on our side and on yours.

    You report faults primarily by e-mail, and we respond within two working days. How long the fix takes depends on the fault.

    What we do

    • Maintenance, backups and fault handling
    • Updates that follow changes in legislation
    • We respond to the faults you report

    What we ask of you

    • One contact who collects the reports
    • You tell us when the production process or a formulation changes
    • When a new colleague is being trained, you let us know if you need help
us you process map paper templates offer master data interface who sees what training feedback

No hourly rate, no surprise items

We name a price after the assessment, because it depends on the size of your production, on your processes and on the number of products. You get a specific offer at the end of the assessment.

  1. Assessment

    It has a fixed fee. We map the production process, and you get a written status report and an offer. The fee counts toward the implementation price.

  2. Implementation

    Fixed price, with the scope set down in advance. No hourly rate, and no item you only hear about afterwards.

  3. Operation

    A monthly fee. It covers maintenance, backups, fault handling and updates.

Our typical clients are manufacturers with 5–100 employees who keep their traceability in Excel or on paper today.

counts toward step 2 Assessment fixed fee Implementation fixed price Operation monthly fee

Who it is for, and who it is not

It is probably for you

  • A manufacturer with 5–100 employees: cosmetics, skincare, perfume or food supplements
  • You manufacture yourselves, batch by batch — not trading only
  • Today Excel, paper or a system you have outgrown carries your traceability
  • You are under GMP expectations: ISO 22716, HACCP, COSMOS or customer audits
  • There is one person who can be our partner during the implementation

Probably not

  • You use a contract manufacturer, and production does not physically happen at your site
  • A few SKUs, a handful of batches a month — Excel is still enough for that
  • You run a working, maintained ERP with a GMP module
  • You are looking for a turnkey boxed product you can switch on tomorrow

What people usually ask beforehand

Short answers to what usually comes up before an assessment.

Is our company too small for a traceability system?

It does not come down to headcount. It comes down to how long the chain is. If a few batches go out each month and Excel is still easy to follow, then it really is too early.

But if you already cannot say from memory which finished products a raw material lot went into, being small will not protect you from anything.

Can we move our existing Excel data into the new system?

We load the master data into the system: items, formulations, suppliers, warehouses. That is part of the implementation.

We are more careful with old production history. We move what is orderly and reliable, and the rest stays where it is today. Exactly what gets moved in your case is decided in the assessment, not before.

How much extra work is a traceability system for the people in production?

About the same as today. What used to go on the production sheet now goes into the system. We aim for no action to need more data than it does on paper.

Recording is done on a desktop computer today. The interface can be set up in English or Hungarian, and the team gets training as part of the implementation.

Where is our production data stored, and who can access it?

The application and the database run within the EU, in the Frankfurt region. Your data is stored separately per company: a user from another organisation cannot reach it.

On your side, roles decide who sees what and who may record what, and you define them. Every critical action goes into the audit log, which cannot be rewritten afterwards.

On our side, only an authorised developer can reach live data, and only to fix a fault or at your request. We log every such access.

Can we export our data if we later move to another system?

The data is yours. If you leave, you get it in a portable, machine-readable format, not in screenshots or PDFs.

Does the system audit our company or certify our compliance?

No. We are not auditors, and we do not certify compliance. That is done by a qualified professional.

What the system does is keep your production documentation in order, so an audit or a customer's question does not send you searching through folders. Giving the answer is up to you, and the verdict does not come from us.

The manufacturers we build for

Manufacturers whose traceability system we design and build.

Industry
perfume and cosmetics
Project
production traceability system (traceability MVP)
Year
2026

30 minutes, and you know what is worth moving into a system

We start with a 30-minute conversation. There is no presentation: I ask how you manufacture, and tell you which parts of it are worth moving into a system.

Language:EN– change language
Back to top